Project details

EnergyLink outfitted a cryptocurrency mining operation with a 500 kW ground mount solar array. The objective of the project was to allow the data center owners to more sustainably mine crypto. Benefits of the project include:

  • Improved system uptime: With solar as a source of on-site power, the data center will maintain a high system uptime for its servers and endpoints. Additionally, it will allow them to mine cryptocurrency for longer periods of time.
  • Efficient mining: Mining Bitcoin and other cryptocurrency takes a lot of bandwidth and power. Drawing solar power, which costs less than power supplied by the data center’s local utility grid, will drive mining costs down and increase the operation’s profitability.
  • M&V reporting: Solar system performance will be tracked through measurement and verification protocols, with reports generated frequently to display system production, carbon offset, and economic results.

Data Center at a glance...

Undisclosed

March 2022

Fall 2022

and all solutions we will install

Project snapshots

Completed projects

Showcasing our value

Take a look at these case studies to see the results we produce. Get in touch below if you’re interested in learning how we can assist your corporation.

Start your project

Fill out the form below and an EnergyLink representative will get back to you as soon as possible to start the process

Get a quote now

Fill out the form below and an EnergyLink representative will contact you shortly.

Start your project

Fill out the form below and an EnergyLink representative will get back to you as soon as possible to start the process