Macon - National Guard Case Study

Client background

EnergyLink helped the National Guard install a 51 kW rooftop solar array on their Macon, Missouri location using Ironbridge metal seamed roof racking. Fronius inverters were used to connect the array to their facility, and the brand of solar panels used was Trina Solar.

Products installed

Quick facts

Project location

Macon, MO

Project date

June 2020

Project length

2 months

Payback period

Confidential

Projected utility savings (year 1)

$-

Projected utility savings (10 years)

$-

Projected utility savings (20 years)

$-

Annual kWh Savings

Confidential

Pounds of CO2 offset

Confidential

Pounds of coal burned

Confidential

Acres of U.S. forests preserved

Confidential

Smartphones charged

Confidential

Learn more about the project

Download the full case study to learn why the client wanted to do this project, the client’s background, challenges with the project, and the creative solutions EnergyLink’s engineering and construction team came up with to get the best out of their facility and yield the best economic results.

Download the Macon - National Guard Case Study

Fill out the form below and the case study will be sent to you.