University of Colorado Anschutz Medical Campus | Case Studies | EnergyLink
Search
Close this search box.

University of Colorado Anschutz Medical Campus

Project details

The University of Colorado sought guidance from EnergyLink to design, build and fund a 236.5 kW solar array at their Anschutz Medical Campus. The goal of the project was to advance the university’s ambitious sustainability goals. Most notably, the project was funded through a Power Purchase Agreement (PPA), resulting in positive cash-flow from day one after the system was installed.

Some quick facts on the project...

Boulder, CO

December 2023

and all solutions we installed

Financial stats

$-

Year 1 realized savings

$-

Year 10 projected savings

$-

Year 20 projected savings

Sustainability equivalency data

371,547

Annual kWh offset

580,497

CO2 emissions offset (lbs)

1.7

Acres of forest preserved

Project snapshots

Highlighted applications

We're results focused

Take a look at these case studies to see the results we produce. Get in touch below if you’re interested in learning how we can assist your corporation.

Project

Get the case study

Fill out the form below and you will receive an email with your case study/eBook shortly

Get a quote now

Fill out the form below and an EnergyLink representative will contact you shortly.