TelGaAs Inc. Case Study

Client background

TelGaAs is a manufacturer in the O’Fallon, Missouri area who creates custom microwave & millimeter wave components. Specifically, the company provides components for radar, satellite communication, electronic intelligence and aerospace parts for its business clients.

They already had a 25 kW solar array on their property and, after seeing the benefits that provided, wanted to add an additional rooftop solar array and a ground mounted solar array to their current one. The process of connecting the two was initially a challenge for the EnergyLink team, but the end result was very rewarding for TelGaAs.

Products installed

Quick facts

Project location

O'Fallon, Missouri

Project date

December 2018

Project length

1.5 months

Payback period

2.5 years

Projected utility savings (year 1)

$13,650

Projected utility savings (10 years)

$160,134

Projected utility savings (20 years)

$386,018

Annual kWh Savings

94,725

Pounds of coal burned

73,230

Acres of U.S. forests preserved

0.544

Smartphones charged

8,541,397

Learn more about the project

Download the full case study to learn why the client wanted to do this project, the client’s background, challenges with the project, and the creative solutions EnergyLink’s engineering and construction team came up with to get the best out of their facility and yield the best economic results.

Download the Full Telgaas case study

An email with the download link will be sent to you after you submit your request.